3967. Finish Time of Tasks II πŸ”’

Description

You are given an integer n representing the number of tasks in a project, numbered from 0 to n - 1. These tasks are connected as an undirected tree. This is represented by a 2D integer array edges of length n - 1, where edges[i] = [ui, vi] indicates an undirected connection between task ui and task vi.

You are also given an array baseTime of length n, where baseTime[i] represents the time to complete task i.

For any chosen task as the root, the finish time of each task is calculated as follows:

  • Leaf task: The finish time is baseTime[i].
  • Non-leaf task:
    • Let earliest be the minimum finish time among its children, and latest be the maximum finish time among its children.
    • Let ownDuration be (latest - earliest) + baseTime[i].
    • Finish time of task i is latest + ownDuration.

Choose any task as the root and compute the finish time of that root based on the rules above.

Return the minimum possible finish time among all choices of root.

 

Example 1:

Input: n = 3, edges = [[0,1],[1,2]], baseTime = [9,1,5]

Output: 14

Explanation:

0 9 1 1 2 5

The optimal choice is to treat task 1 as the root.

  • Task 0 is a leaf, so its finish time is baseTime[0] = 9.
  • Task 2 is a leaf, so its finish time is baseTime[2] = 5.
  • Task 1 has two children with finish times 9 and 5:
    • earliest = 5, latest = 9
    • ownDuration = (latest - earliest) + baseTime[1] = (9 - 5) + 1 = 5
    • Finish time of task 1 is latest + ownDuration = 9 + 5 = 14

Thus, the minimum possible finish time among all choices of root is 14.

Example 2:

Input: n = 3, edges = [[0,1],[0,2]], baseTime = [4,7,6]

Output: 12

Explanation:

0 4 1 7 2 6

The optimal choice is to treat task 0 as the root.

  • Task 1 is a leaf, so its finish time is baseTime[1] = 7.
  • Task 2 is a leaf, so its finish time is baseTime[2] = 6.
  • Task 0 has two children with finish times 7 and 6:
    • earliest = 6, latest = 7
    • ownDuration = (latest - earliest) + baseTime[0] = (7 - 6) + 4 = 5
    • Finish time of task 0 is latest + ownDuration = 7 + 5 = 12

Thus, the minimum possible finish time among all choices of root is 12.

Example 3:

Input: n = 4, edges = [[0,1],[0,2],[2,3]], baseTime = [5,8,2,1]

Output: 16

Explanation:

0 5 1 8 2 2 3 1

The optimal choice is to treat task 1 as the root.

  • Task 3 is a leaf, so its finish time is baseTime[3] = 1.
  • Task 2 has one child task 3:
    • earliest = latest = 1
    • ownDuration = (latest - earliest) + baseTime[2] = 0 + 2 = 2
    • Finish time of task 2 is latest + ownDuration = 1 + 2 = 3
  • Task 0 has one child task 2:
    • earliest = latest = 3
    • ownDuration = (latest - earliest) + baseTime[0] = 0 + 5 = 5
    • Finish time of task 0 is latest + ownDuration = 3 + 5 = 8
  • Task 1 has one child task 0:
    • earliest = latest = 8
    • ownDuration = (latest - earliest) + baseTime[1] = 0 + 8 = 8
    • Finish time of task 1 is latest + ownDuration = 8 + 8 = 16

Thus, the minimum possible finish time among all choices of root is 16.

 

Constraints:

  • 1 <= n <= 105
  • edges.length = n - 1
  • edges[i] == [ui, vi]
  • 0 <= ui, vi <= n - 1
  • ui != vi
  • The input is generated such that edges represents a valid undirected tree.
  • baseTime.length == n
  • 1 <= baseTime[i] <= 105

Solutions

Solution 1

Thinking

The finish-time formula matches part I, but any node may be the root and we want the minimum. Re-running DFS from every root is too slow.

Reroot: first compute subtree quantities from root \(0\), then a second DFS folds the parent-side finish time into the current node, yielding the answer as if that node were the root.

This directory has no implemented solution yet; the walkthrough stops at rerooting part I’s formula.

1